The cheapest fix is the one made before anything has been built.

What you receive
  • Option studies with weighted comparisons
  • Concept site plans and development phasing
  • Order-of-magnitude estimates per option
  • A defensible basis for the go decision

Where a facility sits determines what it will cost forever: power availability, grade, access, water, and neighbors. ICPE evaluates sites and develops facility plans while every option is still cheap to change.

Site selection and master planning decisions made before the first foundation is poured have a significant impact on a project's long-term cost and optionality. ICPE draws on decades of experience and hundreds of greenfield and brownfield projects to help clients ask the right questions early: evaluating site conditions, utility access, permitting constraints, and future expansion potential before capital is committed. Getting this phase right doesn't just avoid costly surprises during construction; it sets the foundation for everything that follows.

Interconnection is usually the deciding constraint and the last one anybody checks. Available capacity, the cost of the utility upgrade, and the queue time to get it can turn the cheapest parcel into the most expensive project, so the utility question gets asked before the land is under contract rather than after.

That same forward-looking approach extends to planning for multiphase buildouts. ICPE designs site layouts and infrastructure so that each phase of a project stands on its own, fully functional and independently operable, while still accommodating future growth. This means Phase 2, 3, or beyond can be added without demolishing, retrofitting, or disrupting what was already built in Phase 1, saving owners from the compounding costs and operational downtime that come with reactive, unplanned expansion.

Scope of evaluation

01Feasibility and concept studies
02Site screening and comparative evaluations
03Utility capacity and interconnection assessments
04Master planning and phased development layouts
05Rough-order-of-magnitude costs by option
06Permitting pathway identification

Need planning & site selection? Let's talk specifics.

Send the scope, the site, and the schedule. A principal engineer will say straight out whether ICPE is the right firm for it.